Determining the Most Effective Factors on Open Pit Mine ...

Up to10%cash back  Determination of ultimate pit limit, and sequence of blocks extraction through the mine life is referred as mine design and planning. The aim of mine design and planning is to develop a yearly extraction plan which guides the mining operation to the highest Net Present Value (NPV). Future mines are going to be giant mines that exploit low grade ...

Get Price

Optimized open pit mine design, pushbacks and the gap ...

the time of pushback design is proposed, which can lead to mine designs with increased NPV. Keywords: Pushback design, open pit optimization, cardinality constrained graph closure. DOI: 10.1134/S1062739114030132 INTRODUCTION Open pit mine design and long-term production scheduling is a critically important part of mining ventures.

Get Price

Open-Pit Mine Planning and Design

of Open Pit Mine Planning and Design starting at the geological resource model, through to the reserve statement and including all aspects of the value chain. This unique course enables you to learn the basic theory of open pit mine design and the application thereof, whilst having the chance to interact with experts in the field.

Get Price

OPEN PIT MINE PLANNING: ANALYSIS AND SYSTEM

planning and design processes employed by surface mining oil sands operations vary in distinct ways from other commodities mined by both hard and soft rock open pit methods. The unique waste handling needs, including tailings disposal, of contemporary oil sands mining

Get Price

An Open Pit Design Model - SAIMM

An Open Pit Design Model By R. H. ROBlNSON nod N. B. PRENN SYNOPSIS The model described is a design and economic planning tool for analyzing surface mineral deposHs. Mineralization, topography, costs and significant goologic feature.'! are input to the model.

Get Price

Pushback Design of Open Pit Mines Under Geological and ...

Pushback Design of Open Pit Mines Under Geological and Market Uncertainties C Meagher1, S A Abdel Sabour2 and R Dimitrakopoulos3 ABSTRACT Strategic open pit mine planning is carried out under multiple sources of technical and financial risks. Given the uncertainty about ore grade, metal prices and foreign exchange rates, assigning dollar values ...

Get Price

Everything You Need To Know About Open Pit Mining ...

Nov 01, 2018  From the initial onset of the open pit mine design planning stage, the gathering of data and getting permits, addressing the impact of mining on the environment are of the utmost importance. Beginning with exploration, the core holes must be sealed, and the site reclaimed.

Get Price

DETERMINATION OF ULTIMATE PIT LIMITS IN OPEN MINES

Abstract: Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price.

Get Price

Selection of practical bench height in open pit mining ...

In open pit mining, factors that can affect the degree of dilution can be regarded as deposit-related or mine-related. The bench height is a mine-related parameter that can be studied using a simple geometrical model of the deposit. By changing this parameter individually, while the deposit-related parameters (such as ore

Get Price

DESIGN OF STABLE SLOPE FOR OPENCAST MINES

the mining operation. Design of the final pit limit is thus governed not only by the ore grade distribution and the production costs, but also by the overall rock mass strength and stability. The potential for failure must be assessed for given mining layouts and incorporated into the design of the ultimate pit.

Get Price

Optimized open pit mine design, pushbacks and the gap ...

the time of pushback design is proposed, which can lead to mine designs with increased NPV. Keywords: Pushback design, open pit optimization, cardinality constrained graph closure. DOI: 10.1134/S1062739114030132 INTRODUCTION Open pit mine design and long-term production scheduling is a critically important part of mining ventures.

Get Price

Geotechnical Factors In Open Pit Mine Design U.S. Rock ...

1.0 N. The object of this paper is to discuss those aspects of open pit mine design which are affected by geotechnical factors. The temptation exists for some practitioners of geotechnical engineering to believe that this relatively new engineering discipline is the 'be all and end all of mining., In the opinion of the authors, this is fallacious but, as our ability to put numbers to the ...

Get Price

OPEN PIT MINE PLANNING: ANALYSIS AND SYSTEM

planning and design processes employed by surface mining oil sands operations vary in distinct ways from other commodities mined by both hard and soft rock open pit methods. The unique waste handling needs, including tailings disposal, of contemporary oil sands mining

Get Price

Pushback Design of Open Pit Mines Under Geological and ...

Pushback Design of Open Pit Mines Under Geological and Market Uncertainties C Meagher1, S A Abdel Sabour2 and R Dimitrakopoulos3 ABSTRACT Strategic open pit mine planning is carried out under multiple sources of technical and financial risks. Given the uncertainty about ore grade, metal prices and foreign exchange rates, assigning dollar values ...

Get Price

Pit Optimization – How I View It

Jun 03, 2015  Pit Optimization – How I View It. One of the first steps in open pit mine design is the pit optimization analysis. Pit optimization is used to define the most profitable pit shell (or nested pit shells) for a given set of economic parameters. The economic parameters include the metal prices, process recoveries, and operating costs.

Get Price

DETERMINATION OF ULTIMATE PIT LIMITS IN OPEN

Abstract: Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price.

Get Price

Selection of practical bench height in open pit mining ...

In open pit mining, factors that can affect the degree of dilution can be regarded as deposit-related or mine-related. The bench height is a mine-related parameter that can be studied using a simple geometrical model of the deposit. By changing this parameter individually, while the deposit-related parameters (such as ore

Get Price

DESIGN OF STABLE SLOPE FOR OPENCAST MINES

the mining operation. Design of the final pit limit is thus governed not only by the ore grade distribution and the production costs, but also by the overall rock mass strength and stability. The potential for failure must be assessed for given mining layouts and incorporated into the design of the ultimate pit.

Get Price

SLOPE STABILITY ANALYSIS FOR OPEN PITS 1

Analyses of a deep wall in an open pit mine in the Peruvian Andes are used to compare limit equilibrium methods (SLIDE) with distinct element methods (UDEC) when the stability is controlled by rock mass strength. The pit wall has an overall slope angle of 37º and a

Get Price

Design of Surface Mine Haulage Roads - A Manual

Design of Surface Mine Haulage Roads – A Manual By Walter W. Kaufman and James C. Ault ABSTRACT This Bureau of Mines manual for design of surface mine haulage roads covers such aspects of haulage road design as road alignment (both vertical and horizontal), construction materials, cross slope, and drainage provisions.

Get Price

Slope Design and Implementation in Open Pit Mines ...

and also limitations through case studies of slope design in open pit mines. Keywords: slope stability, slope design, engineering geology, fault, open pit mines, SOMAIR uranium mine, OCP phosphate mine 1. INTRODUCTION Slopes of mines and quarries, some of which may reach several hundred meters deep, must be

Get Price

Block size selection and its impact on open-pit design and ...

open-pit design and mine planning by R.M. Jara*, A. Couble*, X. Emery†, E.J. Magri†, and J.M. Ortiz† Synopsis This work evaluates and characterizes the impact of the support size and mining dilution of a block model in the operation and selection of equipment at an open pit mine

Get Price

Geotechnical considerations for the stability of open pit ...

Open Pit Slope Design’ (Read Stacey 2009), are addressed in Chapter 14: Open Pit Closure (van Zyl 2009). The chapter outlines the following typical steps in developing an open pit closure plan: • Develop closure goals and criteria, with local community and other stakeholder engagement.

Get Price

Open Pit Mine Planning and Design - A guide to using Open ...

Nov 23, 2016  Open Pit Mine Planning and Design: Step one. Select the pit design strings then optionally select a boundary string. Open Pit Mine Planning and Design: Step two. Produce a solid wireframe of the pit. The pit shell solid represents the shape and volume of material that will be excavated throughout the life of mine.

Get Price

3 Elements of Open-pit Mining and Their Selection Factors

Dec 16, 2020  The main factors affecting the design of the development system are: the natural conditions of deposit occurrence, size of open-pit mining boundary, production capacity, type of technology and equipment, procedure of deposit development, general layout of mining area, relevant state technology, economic policies, supply conditions of equipment ...

Get Price

Geotechnical Factors In Open Pit Mine Design U.S. Rock ...

1.0 N. The object of this paper is to discuss those aspects of open pit mine design which are affected by geotechnical factors. The temptation exists for some practitioners of geotechnical engineering to believe that this relatively new engineering discipline is the 'be all and end all of mining., In the opinion of the authors, this is fallacious but, as our ability to put numbers to the ...

Get Price

Design of openpit mining - SlideShare

Mar 13, 2012  3) Should be near the External dump / Coal yard / Mine service facilities etc. 4) Main haul road upto the pit limit should be planned in the beginning only. 5) Since haul costs constitute about more than 40% and tyre costs about 10% of the total mining costs,priority for design,construction and maintenance should be given.

Get Price

Pushback Design of Open Pit Mines Under Geological and ...

Pushback Design of Open Pit Mines Under Geological and Market Uncertainties C Meagher1, S A Abdel Sabour2 and R Dimitrakopoulos3 ABSTRACT Strategic open pit mine planning is carried out under multiple sources of technical and financial risks. Given the uncertainty about ore grade, metal prices and foreign exchange rates, assigning dollar values ...

Get Price

DETERMINATION OF ULTIMATE PIT LIMITS IN OPEN

Abstract: Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price.

Get Price

DESIGN OF STABLE SLOPE FOR OPENCAST MINES

the mining operation. Design of the final pit limit is thus governed not only by the ore grade distribution and the production costs, but also by the overall rock mass strength and stability. The potential for failure must be assessed for given mining layouts and incorporated into the design of the ultimate pit.

Get Price

Block size selection and its impact on open-pit design and ...

open-pit design and mine planning by R.M. Jara*, A. Couble*, X. Emery†, E.J. Magri†, and J.M. Ortiz† Synopsis This work evaluates and characterizes the impact of the support size and mining dilution of a block model in the operation and selection of equipment at an open pit mine

Get Price

17* Open Pit Optimization - Strategies for Improving ...

ABSTRACT: The open pit design and scheduling problem is a large-scale optimization problem that has attracted considerable attention during the last 40 years The development of the "know-how" to improve economics of open pit mining projects through the use of mathematical optimization techniques goes back to early 1960's.

Get Price

Geotechnical considerations for the stability of open pit ...

Open Pit Slope Design’ (Read Stacey 2009), are addressed in Chapter 14: Open Pit Closure (van Zyl 2009). The chapter outlines the following typical steps in developing an open pit closure plan: • Develop closure goals and criteria, with local community and other stakeholder engagement.

Get Price

Design of Surface Mine Haulage Roads - A Manual

Design of Surface Mine Haulage Roads – A Manual By Walter W. Kaufman and James C. Ault ABSTRACT This Bureau of Mines manual for design of surface mine haulage roads covers such aspects of haulage road design as road alignment (both vertical and horizontal), construction materials, cross slope, and drainage provisions.

Get Price

The mine planning process for an open-pit diamond mining ...

mining cost depth escalation factor is currently US 1.6 cents per bench (bench height is 14 m). Processing costs The Letseng processing plants are also contractor-operated. Treatment costs comprise the contractor labour rates, power, spares, and consumables per ton. The mine planning process for an open-pit diamond mining operation

Get Price

OPTIMISATION OF OPEN PIT MINE BLOCK SEQUENCING

ii optimisation of open pit mine block sequencing Abstract An important stage in openpit mining is to determine the optimal sequence of block extraction, which affects mining profitability considerably. problem which A arises in this stage, pit mine block sequencing problemopen , is defined in order to

Get Price

Estimating Mining Factors (Dilution and Ore Loss) in Open ...

Jan 01, 2007  Large open pit mines are driven by the economies of scale that are achieved at the cost of less selectivity in the discrimination of ore and waste. Planning for these mines is facilitated by the use of block models for mine design, scheduling and the conversion of

Get Price

Optimization of blasting design parameters on open pit bench

mines Nchanga Open Pit mines are located in Chingola, in the Copperbelt province of Zambia. Open Pit mining at Nchanga started in 1938, in the main Nchanga Open Pit. More than a decade ago, Nchanga Open Pit was the largest base metals open cut in the world. It is still among the top five largest open cuts in the world. The mine’s core

Get Price

Geotechnical Factors In Open Pit Mine Design U.S. Rock ...

1.0 N. The object of this paper is to discuss those aspects of open pit mine design which are affected by geotechnical factors. The temptation exists for some practitioners of geotechnical engineering to believe that this relatively new engineering discipline is the 'be all and end all of mining., In the opinion of the authors, this is fallacious but, as our ability to put numbers to the ...

Get Price

3 Elements of Open-pit Mining and Their Selection Factors

Dec 16, 2020  The main factors affecting the design of the development system are: the natural conditions of deposit occurrence, size of open-pit mining boundary, production capacity, type of technology and equipment, procedure of deposit development, general layout of mining area, relevant state technology, economic policies, supply conditions of equipment ...

Get Price

Pushback Design of Open Pit Mines Under Geological and ...

Pushback Design of Open Pit Mines Under Geological and Market Uncertainties C Meagher1, S A Abdel Sabour2 and R Dimitrakopoulos3 ABSTRACT Strategic open pit mine planning is carried out under multiple sources of technical and financial risks. Given the uncertainty about ore grade, metal prices and foreign exchange rates, assigning dollar values ...

Get Price

Open pit mine planning considering geomechanical

of the mine [4]. Several factors must be taken into account during the mine planning process to fulfil the main goal of the open pit mine planning to maximise the value of the business according to the strategic objectives of the mining company. These factors include the economic parameters, such as, costs and

Get Price

OPEN PIT MINE PLANNING: ANALYSIS AND SYSTEM

planning and design processes employed by surface mining oil sands operations vary in distinct ways from other commodities mined by both hard and soft rock open pit methods. The unique waste handling needs, including tailings disposal, of contemporary oil sands mining

Get Price

DESIGN OF STABLE SLOPE FOR OPENCAST MINES

the mining operation. Design of the final pit limit is thus governed not only by the ore grade distribution and the production costs, but also by the overall rock mass strength and stability. The potential for failure must be assessed for given mining layouts and incorporated into the design of the ultimate pit.

Get Price

Guidelines and considerations for open pit designers - Deswik

Mar 26, 2018  The design is controlled by the engineer doing the design. Your company may have a haul road/pit design manual – use it if it exists. For those that do not have a design manual, or only have limited guidelines, then this article may help you in the process of designing your first pit. The end-purpose of your pit design will likely be:

Get Price

The mine planning process for an open-pit diamond mining ...

mining cost depth escalation factor is currently US 1.6 cents per bench (bench height is 14 m). Processing costs The Letseng processing plants are also contractor-operated. Treatment costs comprise the contractor labour rates, power, spares, and consumables per ton. The mine planning process for an open-pit diamond mining operation

Get Price

Development of a mine dewatering and pit slope ...

Most large open pit mines eventually require some form of proactive depressurisation in order to support desired Factor of Safety (FoS) for the inter-ramp and overall slope design angles. The impact of groundwater on pit wall stability and the role of pore pressure on slope design

Get Price

An investigation into the parameters that affect the swell ...

design and reported volumes for different parts of the mining process and cast blasting methods at various locations around Callide mine. The Callide coal mine along with most mines worldwide have been using a swell factor as a variable in open cut mine design and volume removed calculations throughout history.

Get Price

Investigation of Excavator Performance Factors in an Open ...

Several factors effecting productivity like location design, truck model, exca-vator model, weather conditions, material type, shift availability, truck-excavator matching, etc., were used to assess performance, using loading cycle time data. The use of loading cycle time for measuring performance of the -pit mine open

Get Price

Methodology for a dump design optimization in large

In large-scale open pit mines, the mining process is rather complex and often involves different run-of-mine (ROM) ore and waste material treatment downstream. Appropriate areas to place these large amounts of material are limited and their selection and design must serve the environmental factors and economic goals of the long-term mine plans.

Get Price

Functional Optimization of Open Pit Mine Design

May 25, 2019  Table of ContentsCross Section Input DataOptimization MathematicsOptimization UtilizationOptimization Example In the development of the ultimate pit limits for a narrow ore body, parameters necessary in the design of a functional, or working, pit become highly sensitive factors in the determination of ore reserve levels and their associated waste to ore stripping ratios. Through the

Get Price

11.19.1 Sand And Gravel Processing

dredging. Open pit excavation is carried out with power shovels, draglines, front end loaders, and bucket wheel excavators. In rare situations, light charge blasting is done to loosen the deposit. Mining by dredging involves mounting the equipment on boats or barges and removing the sand and gravel from the bottom of the body of water by ...

Get Price

Copyright © 2021.Company name All rights reserved. Sitemap